Migration overview
A clear view of progress, priorities and the next handover.
Getting your migration overview
Loading current progress. You can choose a section above.
Compare the loaded metadata with extracted PDFs. Uploaded archives still need to be unpacked and checked.
Batch processing
Checking the processing queue…
Understanding the document counts
Tracked documents are registered from metadata or discovered in archives. This total does not confirm that every PDF has arrived.
Unpacked / registered counts PDF entries recorded during unpacking, including damaged entries. Uploaded ZIP volumes are counted here only as their individual PDFs are examined. Downloading and decrypting the archive happens first.
PDF checks run after extraction: encrypted PDFs, files over 30 MB, invalid pages and documents that appear entirely blank are held for review. Originals and blank pages are retained. Final naming still needs complete metadata.
In processing includes documents waiting for validation or being checked. Awaiting release means validated and waiting for your release settings.
Refreshed shows when the dashboard last fetched data, not how far the import has progressed. Counters update in the background and can lag during large imports; a recent refresh does not guarantee they have caught up.
Collected means the MID server removed a released file from the ready folder. Confirm the final import separately in ServiceNow EDM.
Check the delivery audit and damaged-file reports before confirming completeness to GBS.
Start with employee mappings
43,300 documents are waiting for complete mapping data — mostly employee IDs without a GID (28,400).
61,210 documents need attention across 5 causes.Document journeyExplore the processing stages and their blockers
PDF content is checked before final naming, even when employee information is missing. Passing these checks does not release a file or confirm its import into EDM.
Throughput
Files processed by COIN compared with files collected by the ServiceNow MID server
Recent activity
Latest events across GBS, COIN and the MID server
Needs attention
Documents held back, by cause
Causes
Select a cause to see what it means and what happens next
New errors per day
Last 7 days. Fewer new errors each day as mappings arrive from HR.
Complete the missing information
Counts refer to documents, not employees. Request a metadata report by email to review the affected rows.
By country
Tracked documents, including PDFs not yet matched during unpacking
By document type
Tracked documents, including PDFs not yet matched during unpacking
Documents by year
Date on the document, from the GBS metadata file
Manage batchesChoose what runs next
Select batches, add them to the queue, then start. They run one at a time; releasing files stays separate.
All batches
Select batches to addPause holds the next batch. A finished run can still have issues to resolve; release stays separate.
Sign in to see the remaining work.
Upload corrections
Choose a correction file
Upload one file at a time, up to 10 MB and 15,000 correction or employee rows. Unfilled correction rows count; the “Affected documents” sheet does not. Partial updates are welcome.
File formats and template
Use a SmartArchive report. Fill the yellow cells and keep its headings. Missing names and other metadata are supported.
Use GID, User name, u_country_iso_code and an optional ARE column. Supply a name, an ARE, or both. ARE fills missing values for the same GID and country; existing values stay unchanged.
Download CSV templateUse the original Excel report or export its Corrections sheet as CSV UTF-8 (commas or semicolons). Keep the headings and leading zeros. For employee ARE uploads, country can be blank when all known documents agree on US or CA. Missing ARE values are checked against the newest dated source for the same GID and country; ambiguous values stay for review. Other workbook sheets require Excel. Audit reports are read-only.
After uploading corrections
Follow the upload in Correction uploads below. Work continues if you leave the page. The result separates documents sent for processing, awaiting their PDFs, and still blocked.
Accepted corrections can still leave other missing information to resolve. Review skipped or conflicting rows, and request a fresh Metadata report after the correction job finishes.
Corrections supplied before unpacking are saved until the PDF is registered. Uploading metadata cannot repair a damaged PDF.
One name fixes many documents: an accepted employee name applies to eligible documents for the same GID across batches, even if the report was scoped to one batch. Existing names and completed documents are not overwritten.
Correction uploads
Sign in to see correction uploads.
Service & support details
Live checks appear after sign-in.
Connection details
Archive runs
Each GBS batch is unpacked, processed, verified complete, then its validated documents are staged for release.
Collection means the MID server removed a released file. Final import is confirmed separately in ServiceNow EDM.
Download activity, last 24 hours
Each block is one hour. Green hours had downloads by the MID server.
Recent downloads
Each file the MID server downloaded, from the SFTP and SSH logs. Folder and GID only — no names.
| When | Document | User | Via |
|---|
Change batch size
Processing, release and collection
Processing prepares PDFs. Release makes validated files available for MID-server pickup. Their pause controls are separate.
Pausing automatic release stops future automatic batches; files already released remain available. Release now can still send a batch while automatic release is paused.
Collected means the MID server removed a released file. Final import must be confirmed separately in ServiceNow EDM.
Change automatic release
Choose how files become available to the MID server. Saved changes take effect within a minute.
Archive details
Archives are released oldest first. Completed archives stay listed for later corrections.
Release history
- 1. Email a reportSend the Excel files to the configured recipients.
- 2. Fill the ExcelFill the yellow cells and keep the headings.
- 3. Upload correctionsUse the existing form in Control Center. Partial updates are welcome.
Email an Excel report
Reports go to the configured recipients. Large reports arrive as numbered Excel attachments.
Names and other missing metadata together.
Or request a specific report
About report scope
Batches appear once processing has unpacked and registered their documents. Uploading an archive alone is not enough.
The selected scope applies to the individual names, metadata and technical-error reports. Current corrections and the delivery audit cover all batches.
Additional reports Delivery audit & technical errors
Have a completed correction file?
Upload it and follow its progress in Control Center.
Report emails
Active requests and recent results. Email accepted means accepted for delivery.
Results reflect the records read when each report was generated; later corrections may have resolved them.
Sign in to see report emails.
